Eschenlohr Projects

300+550 hl ph -Archive-

Beer Filtration, Stabilisation, CO2-Carbonisation and Blending
Two complete filtration lines incl. stabilisation, CO2-carbonisation and blending.
Automatic S7-operated in perfect condition.
Filtration Line 1 – 300 hlph
Buffer Tank, 1.5 bar
82 hl
1993
Dieball
Candle Filter FOS 1500
- 70 m2
- 343 Candles
300 hlph
1994
Filtrox
PVPP Filter ZHF
300 hlph
1975
Schenk
Trapfilter
300 hlph
1994
Filtrox
Buffer Tank, 5 bar
Blending Plant incl. Water Dearation
300 hlph
1994
Diverse
CO2-Carbonisation
1994
Diverse
Operation Mode
S7 – Fully Automatic
1994
Filtration Line 2 - 550 hlph
Buffer Tank, 1.5 bar
82 hl
1993
Dieball
Candle Filter
- 143 m2
- 529 Candles
550 hlph
1994
Filtrox
PVPP Filter ZHF
550 hlph
Schenk
Trapfilter
550 hlph
1994
Filtrox
Buffer Tank, 5 bar
1994
Blending Plant incl. Water Dearation
550 hlph
1994
Diverse
CO2-Carbonisation
1994
Diverse
Operation Mode
S7 – Fully Automatic
1994
2 x Pre-and Post Running Tank
each 504 hl

© 2007 ES PROJECTS GmbH. All rights reserved. Last update: 18.07.2011