Eschenlohr Projects

60.000 hlpa -Archive-

Complete Brewery in perfect condition, build in 1995
Brewery is shut down already, not dismantled.

Overview Brewery

Brewery complete
60,000 hlpa
HGB 75,000 hlpa
expandable
1995
-
Brewhouse, 3-vessel
55 hl / 6 brews
1995
Jakob Carl
Tanks, 20 Tanks
~ 4,500 hl total cap.
95-00
Hinke
Diverse
Filtration, Candle Filter
50 hlph
1995
Filtrox
HGB-Brewing and Flash Pasteurizer
-
1995
APV, Haffm.
Keg- and Keggy-Line
35 kph
1995
Gruber
Softdrink-Plant complete
-
1995
Famix
Laboratory
-
1995
Diverse
Utilities: Steam, Cooling, Air, Water
-
1995
Diverse
Tools and Spare Parts
-
-
-
Malz-Handling
Malt reception for trucks
-
1995
-
Silo plant, 6 cells
60 to total cap.
1995
-
6-roller-malt-mill
1,000 kgph
1995
Seeger
Malt grist bin
-
1995
-
Tubular chain conveyors
-
1995
-
Dedusting device
-
1995
-
Brewhouse

3-vessel Brewhouse

Mash Tun
Lauter Tun
Wort Kettle

1995

Jakob Carl

Brewhouse Capacity

55 hl (cold)
6 brews

1995

-

Material

Stainless steel
Copper hoods

1995

-

Energy

Steam heated
All vessel insulated

1995

-

Operation Mode

S7

1995

Siemens

Automation Mode

Automatic
or Manual

1995

-

Whirlpool

-

1995

-

Wort Acidification Plant
- Maturation Tank
- Dosing Tank

-
2,800 liter
1,100 liter

1995

-

Trub Collecting / Dosing Tank

-

1995

-

Energy Recovery

vapour condensor

1995

-

Spent Grain Silo

14 tons / 12 brews

1995

-

Hot Water Tank

340 hl

1995

-

Ice Water Tank

340 hl

1995

-

Wort Cooler

120 hlph
1-stage Ice Water

1995

-

CIP

2 x Soda caustic
1 x Acid

1995

-

Wort Treatment, Fermentation and Storage
Wort Aeration and Yeast Dosing
-
1995
-
3 Yeast- and 1 Dosing Tub
-
1995
-
Flotation Tanks
2 x 163 hl
1995
Defranchesi
Cylindroconical Fermentation Tanks
4 x 280 hl
0.99 bar
1995
Hinke
Cylindroconical Fermentation Tanks
2 x 542 hl
0.99 bar
2000
Hinke
Storage Tanks
8 x 115 hl
1995
Defranchesi
Storage Tanks
3 x 235 hl
1995
Defranchesi
Storage Tanks
3 x 236 hl
2000
Hinke
Cooling
Sep. Cooling Zones
Without Insulation
Room Cooling needed
1995
-
Total Tank Capacity:
- Fermentation Tanks
- Storage Tanks
-
6 Tanks, 2,204 hl
14 Tanks, 2,333 hl
1995
-
Filtration
Unfiltrate Buffer Tank
1 x 25 hl
2 bar
1995
-
Candle Filter
Kieselghur
Fully Automatic
50 hlph
1995
Filtrox
Cartridge Filter
50 hlph
1995
Filtrox
Pre-/After-Run Tank
1 x 25 hl
2 bar
1995
-
CO2-Carbonisation Unit
1995
Haffmans
Water Deaeration Plant
Vacuum Proceeding
50 hlph
O2-Cont.: 0.001 ppm
1995
APV
Water Buffer Tank
30 hl
1995
Bright Beer Tank
1 x 120 hl
4 bar
1998
Hinke
Bright Beer Tank
3 x 120 hl
4 bar
1995
Defranchesi
CIP-Plant
6 x 40 hl
95/99
APV
Flash Pasteurizer
20 hlph
1999
APV
Keg Filling Line
Complete Keg Filling Line
Kegs / Keggy
35 kph
1997
Gruber
Softdrink Pre-Mixer

Complete Softdrink Pre-Mixer

-

1995

Famix

Utilities
Cooling Plant
131 kW
2002
York
Temperature Control System
-
1995
Linde
Oil Free Air Compressor
1 x 2 m³ph
1 x 1.5 m³ph
incl. Cooling Dryer
90/96
Kaeser
Steam Boiler
1.5 toph
10 bar
Gas
1995
Loos
Brew Water Treatment Plant
- Activated Carbon Filter
- UV-Treatment
- ClO2-Unit
-
4.3 bar, 2,600 liter
-
-
1995
-
Eurowater
-
Prominent
Softdrink Water Treatment
- Ion Exchanger
- UV-Treatment
-
1995
-
Boiler Water Treatment
- Ion Exchanger
2.3 m³ph
1995
-
Laboratory
Laboratory Equipment
-
1995
Diverse

© 2007 ES PROJECTS GmbH. All rights reserved. Last update: 18.07.2011