Eschenlohr Projects

5.000 hlpa

Brewery with 50 hl cast wort per brew. The plant was constructed in 2007 and has an excellent condition. The brewery shut down after app. 40 brews.
Overview
Cast wort 50 hl 2007 BTB
Malt treatment - - -
Brewhouse
- Mash tun
- wort copper
- Lauter tun
- Whirlpool
- Pumps
Stainless steel Heated by steam - -
Wort cooler - - -
Water tanks - - -
Accessories:
Water treatment
Steam boiler
Refrigeration unit
Air compressor
KEG-filler
- - -
Brewhouse – Malt Treatment
Malt mill With grist bin and conveyor 2007 BTB
Grist load 870 kg for 50 hl cast wort - -
Cast wort minimum 35 hl - -
Mash tun- wort copper Stainless steel
for 50 hl cast wort
Internal boiler
Spray ball
Vapor condenser
2007 BTB
Lauter tun Stainless steel
Variable actuator for
raking machine
Grains diverter
2007 BTB
Whirlpool Stainless steel - -
Wort cooler 50 hlph
2 steps
2007 Böhmer
Control Siemens S7 Operatorpanel - -
Hot water tank 100 hl 2007 SSP
Cold water tank 100 hl 2007 SSP
Place requirements for Brewhouse and whirlpool ~ 9,0 x 5,2 x 3,5 m - -
Tanks
6 x ZKG 50 hl useful capacity
60 hl volume
1,0 bar
Stainless steel
2 separated cooling zones
Bunging apparatus
2007 SSP
1 x Bright beer tank 50 hl useful capacity
60 hl volume
3,0 bar
Stainless steel
1 cooling zone
2007 SSP
Accessories Temperature regulation
Spray balls
Fittings
Panels
Tubing
Pumps
- -
CIP-Unit
For brewery 2 vessels 2007 BTB
Accessories
Steam boiler
- with feeding water treatment
1.000 kW 2007 Loos
Air compressor Typ LF 7 2007 Atlas Copco
Refrigeration unit - - -
Water treatment
- Reverse osmosis
Typ Geno Osmo MSR 500 2007 Grünbeck
KEG – filler Typ Multimat MT/2-F 2007 -
Information without engagement

top

© 2007 ES PROJECTS GmbH. All rights reserved. Last update: 18.07.2011